Customized Service

CHENGDU HTLL has been a custom fiber box, metal box, fiber sleeve and fiber optic cable assembly house for over 15 years. Just tell us the ideas, we design and achieve for you. The typical lead time is about 5~7 workdays. As an industry leader, we are the perfect choice for your fiber customized products.

How To Get A Quote?

You can provide us with the requirements of your project:

Email (vivi_yu@cnhtll.cn) or call(+86 81302809206)us a rough sketch to a detailed drawing.
Our engineer will review the project and provide a quotation within 48 hours.

Once an order is placed, we can produce quantities as low as 1 piece and as high as 1,000 pieces in 5~10 workdays. (for even larger quantity, the typically lead time is 2~3 weeks).

Fast Turn Around Time

The typical turn around time is only 1~2 days! Our main goal is to provide our customers with the custom cables, which is required, in a prompt manner.

We make fiber optic cable sleeve, fiber patch cord ,ODF tailor-made for individual customers. According to the specific needs of customers, from the specification, quality and image design tailored for customers, is a "one to one" type of high-quality service.

Custom Fiber Patch Cord

Choose your own length and connector configuration.

Custom Fiber Optic Heat Shrink Sleeve

Tell us the length,color and OD after shrink.we will choose the proper tube and stainless steel rod for you.

Firstly,we will make some sample to you,after testing and confirmed,will start bulk manufacture.

Custom Fiber Metal Box

We can do OEM/ODM and customization. First you provide the concept of the product, then we will discuss the feasibility and find the solution. After that the drawing of scheme will be confirmed by you. If need new mold, it will be made based on the approved drawing, and new samples will be offered as soon as the mold is ready. We will arrange mass production according to the approved new samples.

service_01
service_04
service_06

Lead time

Different manufacturing lead time for different products. Please write to us. We will reply to you ASAP.

Normal manufacturing lead time as below:

Patch cord and fiber sleeve ODF
1~100 pcs : 3 working days. General ODF: 15 working days.  
100~1000 pcs : 7 working days. New Design (Sample): 21 working days.
Over 10000 pcs : 10 working days.